VAECO to support ANA and KE for Engine replacement at Hanoi
VAECO provided facilities, tools, equipment and man power to support ANA (All Nippon Airways) and KE (Korean Air) engine replacements on the...
Since 15 January 2016, VAECO is going to provide technical handling including technical airworthiness release for Kenya Airways’ Hanoi B787 aircraft flights. The B787 Dreamliner is the newest genera...
CAR-145 approval has been granted to VAECO by the General Civil Aviation Authority of UAE for servicing, line maintenance and airworthiness release of Etihad A330F (RR Trent 700) at Hanoi and A330P/A3...
Sky Angkor Airlines (ZA) awarded VAECO to carry out cabin reconfiguration on its first A321 Aircraft in December 2015. ZA is the first foreign airline for which VAECO performed interior reconfiguratio...
As requested, VAECO has sent a maintenance team including 1 CRS B1 full, 1 CRS B2 full, 2 mechanics, 1 dock planner, 1 CRS of sheet-metal level 3, 1 QC and 1 coordinator to Chiang Mai, Thailand to per...
On November 6, 2015, when performing maintenance check for Boeing 777, reg. VN-A143, a team of three technical staff (Mr. Dao Van Duc, Le Van Thuan, Pham Trong Vi) working at VAECO's HAN Base Maintena...
VAECO’s technical engineers performed the V2500 engine replacement and the additional A check package for an A320 aircraft at the request of Sky Angkor Airlines (SWM) in Vientiane, Laos, from 28 Au...